top of page

Water Reclamation District Ph 2 — 496kW

Ground Mount Solar PV

System Size

496kW

System Size

48,661

Gas Equiv. Eliminated

619,039

kWh/Year

--

Load Offset %

432 tons

CO2 Offset/yr

496

Finance Model

GEC Role: Developer & EPC

GEC engineered, procured, and constructed a 496 kW ground mount system for the Village of Sugar Grove Water Reclamation District — managing every phase from site preparation through module assembly, electrical wiring, and commissioning. Robust performance monitoring was implemented at project close to ensure optimized generation over the system's full operational lifetime.

Schedule Your Site Assessment
bottom of page