Water Reclamation District Ph 1 — 496kW
Ground Mount Solar PV
System Size
496kW
System Size
48,661
Gas Equiv. Eliminated
619,039
kWh/Year
--
Load Offset %
432 tons
CO2 Offset/yr
496
Finance Model
GEC Role: Developer & EPC
GEC engineered, procured, and constructed a 496 kW ground mount system for the Village of Sugar Grove Water Reclamation District — managing every phase from site preparation through module assembly, electrical wiring, and commissioning. Robust performance monitoring was implemented at project close to ensure optimized generation over the system's full operational lifetime.