top of page

Moving & Storage Company Ph 2 —208kW

Rooftop Solar PV

System Size

208kW

System Size

--

Gas Equiv. Eliminated

242,693

kWh/Year

--

Load Offset %

170 tons

CO2 Offset/yr

208

Finance Model

GEC Role: Developer & EPC

A second installation for this moving and storage operator required GEC to resolve a significant infrastructure challenge: the existing transformer was insufficient for the solar system's grid connection requirements. GEC coordinated the utility-mandated upgrade from engineering through approval, delivering a 208 kW system generating 242,000 kWh annually.

Schedule Your Site Assessment