Abu Dhabi National Oil Co
Mechanical Design of all aspects of HVAC, Plumbing, Fire Protection of a 67 story high rise building in Abu Dhabi, United Arab Emeritus.
General Energy Corp. (GEC) was part of a team to design and construct a new corporate center 67 story office high rise building for the Abu Dhabi National Oil Co. GEC’s role is the design of a complete HVAC system based on ASHRAE standards and LEED sustainable best practices. The mechanical design including a chilled water network and equipment layout. The Plumbing System (Water Supply, Drainage, and Irrigation) included domestic water supply, drainage, (black water and gray water) including gray water recycling. A fire protection system design including all aspects of fire protection (risers, large water retention fire protection tanks, distributed sprinkler heads are part of GEC’s scope. Also, a state of the art sophisticated Building Management System based on ASHRAE BACNET Protocol is being provided for control and monitoring of the complete MEP Systems of the high rise headquarters complex.
Evelyn Pease Tyner Center, Glenview, Illinois
A Zero Energy Building - Certified LEED Platinum
The Evelyn Pease Tyner Interpretive Center supports activities to further learning and appreciation for the prairie in which it is placed. The design of the center demonstrates how building systems can be symbolic with natural environment through green technologies or sustainable design. General Energy Corp. (GEC) was responsible for design of building’s Mechanical, Electrical, Plumbing, and Fire Protection (MEP/FP) systems.
Alcatel-Lucent Technologies, Lisle/Naperville, Illinois
Campus Consolidation/Relocation
General Energy Corp. (GEC) is responsible for the MEP (Mechanical/Electrical/Plumbing/Fire Protection/Building Automation) design of the consolidation/relocation and construction of electronic laboratories facilities within Alcatel-Lucent Lisle/Naperville, IL Campus.
